Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

May 24, 2022     Wingtip rib installation - (4 hours)       Category: Wings
Scuffed, primed and installed both left and right wingtip ribs plus flanges. Should have riveted the flanges to the wingtips first. Not sure how I'm gonna reach them now. May try and run out after supper and remove the ribs and reinstall. Was able to separate the pieces and reinstall. Riveted the wingtip ribs in place. Whew!


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.